Testing

Testing

We perform testing of the Pools in accordance of the QHSE guidelines. The testing and commissioning work includes the activities in preliminary tests and inspections, functional performance tests and the commissioning of existing installations. The Objective includes:

  • To verify functioning of the equipment/system
  • Monitor the performance of the installed equipment/systems.
  • To measure the performance report for the pools including water quality, power consumption, water flow etc. as the baseline for future operation and maintenance.